summarypartnerscontactnewsresultsprivate

You are in: results>D5.7.2

----------------------------------------------------------------------------------------------------------- Deliverables
-----------------------------------------------------------------------------------------------------------D5.7.2 Final system prototype.

 

The main objective of this deliverable is to update the description of the CONFIDENCE prototype provided in D5.7.1 “First system prototype” .Therefore, the prototype described in this deliverable D5.7.2 supersedes the previous one, described in D5.7.1. Additionally, this document presents the results of the technical tests of the final system prototype.

The modifications of the final prototype with respect to the first system prototype described in D5.7.1 are listed in section.

In the description of this final prototype, all the components are presented. Firstly, the Portable Device is shown. Secondly, the modules which compose the Base Station are listed and described with photos. Finally, the tags, anchors and switch of the final prototype are shown.

The second part of the document presents the results of the technical tests. Once the subsystems were integrated, several tests have been done to confirm that each subsystem works correctly and the overall system fulfils the technical specifications.

 

>Return to results

 

.

FP7 logo
IST logo

EU flag